SERVICE

Pre-Sales Consulting


If you are interested in our products, you can contact us in the following ways

 

Wenzhou Ruiguang Machinery Co.,Ltd.

Tel:  86-577-86927177 13857772175 13857757119

Fax: 86-577-86928630(Factory)

E-Mail:  sales2@cn-rg.com sales1@cn-rg.com

 

 

 

After-Sales Service


After-sales service commitment:
1. Telephone support: For customer inquiries, give answers by telephone.
2. Quality Assurance: Guarantee the quality of the products produced and meet the standards.
3. Service hours: 7 days a week, 24 hours a day, 24 hours a day.

Spare Parts Supply


Spare Parts Supply

We have a variety of product parts inventory, we received a service call to propose a program and then send parts to the fastest possible efficiency of your desired accessories to your side.
 

The configuration of a wide variety of products, different models, different models and the date of manufacture of the parts are different.
In order to ensure the accuracy of accessories, please provide the following information:
1. Machine model and number
2. Machine picture
3. Date of manufacture
4. Required parts photos

 

Tips & Tricks


Rubber Packing Machine Safety Operation Procedure
   1: Before operation, make sure that the machinery and all parts of the electrical appliances are in good condition.
   2: Machines find abnormal noise during operation and stop for maintenance.

   3: When repairing and cleaning up machinery, it must be powered off.

   4: Focus on the operation to prevent the plastic pot from getting burned.

   5: The pressure of the compression spring of the overloaded machinery must be adjusted properly to prevent the pressure adjustment from being too large and losing its protective function, so that it is impossible to stop the vehicle in time when it is overloaded.

   6: When the front platen on the milling back box needs to be opened for repair or adjustment of the internal structure, the power must be turned off first, and then the repair must be completed after the milling back knives are stopped to prevent danger.

   7: The motor for controlling the placement of the rubber wheel needs to be started after the hot melt is melted to prevent the motor from overloading and damage the motor or other machinery. 

   8: Turn off the power after the work is completed.